This project was an owner direct design-build HVAC replacement and retrofit. The Schwenn Team worked with ownership and the mechanical engineering team to design a higher efficient system that better suited the client’s needs than the previous design. Project scope included ductwork retrofit, installation of 30, 40 and 60 ton Trane split systems as well as a 55-ton rooftop packaged 100% Outside Air unit. Coordination effort included working with the building owner and port authority to not impact cruise ship schedules or the ongoing site redevelopment